Thursday, November 20, 2014

Bracket final fab before install

Continued pushing on with the doubler today.  Welded on the rods today, then brought the holes up to tap size and tapped them:

Tapped holes:

My biggest drill wasn't enough to make big enough holes for the rods to go it.  I had to use the plasma to enlarge the holes a bit:

Here you can maybe finally see what I am up to if you had trouble picturing it.  The bracket will fit up onto the frame rail.  The tube will Connect to the bottom of the bracket, and go down and to the left and meet up with the subframe.



No comments:

Post a Comment