Wednesday, November 12, 2014

tube angles

The tubes go 45° across a cube, and one of them gets cut on the horizontal plane, the other on a vertical plane.  The miter isn't clear to me for that.  It is also not clear how many degrees apart they should be.  A quick Solidworks construction:
35.26° miter


Clocked exactly 60° degrees.

Worked out well:




diameter * Pi /6 gave me the arc length for 60° which I put on a note card and wrapped. 

I used a piece of angle to transfer clocking marks from one end to the other:

Anyway it is wicked easy to get confused with this which is why I like to work in PVC first; Which way do I clock 60°?  Also do I want 35.26°, or do I want the compliment of that when I set the miter saw?

Nothing makes me feel dumber than trying to cut crown molding with no chart, and this is sort of like that.  There are lots of weird things like this that I think comes from us constantly trying to break down 3D things into 2D ideas.  Like out of the three perpendicular planes why is there one horizontal plane (top) and 2 vertical (front and right).  maybe horizontal and vertical are inherently bad language to describe 3D.  I think it was Wittgenstein that wrote about how the language we create and understand limits the ideas we can have and how we can communicate.  Maybe this is why things like cross products and angular acceleration seem so weird to us (we live with 2D language and ideas).  Or maybe two eyes is the wrong number to fully take in a 3D world.  Maybe depth perception is not really the same thing as seeing 3D which we couldn't even comprehend.

Tuesday, November 11, 2014

front subframe strength and stiffen part 1



I attached the front subframe and tightened it down and it wasn't that stiff.  I don't want to count on the transmount and the bell housing to stop the engine from moving, and I want the steering rack mounts to be very stiff.  Also, 4 very large bolts held in the subframe in the mustang.
Top of the image shows the area to be worked on.  The hole is the attachment point.  You can see the spring perch near the hole

Decided to add a 3/16 doubler.  Since things were a little curved in the subframe I bent the double both ways with the press.  Shot things with a little weld through primer.  I also cut out the extra spring perch which will be in the way later.



BTW weld through primer really is weld through primer when the voltage is cranked up for thicker material.  No stubbing this time.  Zap:

 I filled in the hole in the frame, which is exactly where I want the tube to go.  I am waiting to weld it so that I can tilt it a little if I have to.  I also started trimming a piece of PVC as a template for the tubing.

Also, I was really close to running out of .030 wire.  11 lbs should hold me for a while.  Order from Amazon, comes from Grainger.  Payed less than on Grainger's site.

Thursday, November 6, 2014

Shifter hole blank

I am down to number 4 from the other day.  I was up too late last night, so I only spent 45 minutes out there today.  Just enough time to cut the blank to close out the shifter hole.  Bent it with my hand in the bench vice.  A little more cutting and grinding and I should have a really good fit:



Wednesday, November 5, 2014

plug welding

I took care of a few things tonight.  One of them was to weld up some burn throughs.  To plug weld you need to back up the hole with a piece of copper, otherwise your attempt to plug the hole will create a bigger hole.  Here is the other key that I missed before, turn the heat way down or your copper will join the filler material.  Many places sell what are called copper spoons for plug welding.  Eastwood's is like $40.  For free you can smash an old piece of pipe in a vice:

Plug weld visible just above the clamp at the opening:

Tuesday, November 4, 2014

Gage pins

Made another craigslist run tonight.  Got some gage pins for pennies on the dollar.  I have wanted a set of these for a while.  I am glad to not have to use my $15 Harbor Freight transfer punches as gage pins anymore which is only slightly better than using your fingers.

Monday, November 3, 2014

Tunnel details

I had about an hour this evening and nearly felt overwhelmed by all the details that need to be completed before I can call the tunnel done:
1) Grind the underside of the tunnel
2) Cut steel and weld in the gaps on top
3) Plug all the burn throughs
4) Close out the stick shift hole
4) Seam sealer everything
5) Primer

Only thing to do is just start working.  I finished number 1 and 2/3 of number 2.

Here is the passenger side of the tunnel as it is right now

 Close up of the driver's side.

Underside.  It has come a long way since I tried to simply slam it wide enough with a hammer.

Sunday, November 2, 2014

Tunnel tack

I tacked in the tunnel today.  I have been curious about welding photography and decided to go for a selfie.  I didn't have the courage to expose the arc:


Once I got everything tacked there were still a couple gaps up to about .080.  I went to the underside of the car and closed the gaps with a couple of light slams with the BFH.